Jira workflow validation checklist

The readiness checks teams actually need before work moves forward — and how to encode them.

2026-07-28

Why transitions leak

Work moves forward before it is ready: missing acceptance criteria, no linked design, no reviewer, no evidence. The fix is rarely a new process — it is making the existing expectation visible at the moment of transition.

The checklist

  • Required fields present (not placeholder text).
  • Linked issue or design where the workflow demands it.
  • Assignee and reviewer distinct, where applicable.
  • Acceptance criteria or definition-of-done reference.
  • Approval recorded for sensitive transitions.

Encoding it

Each item above maps to one rule on one transition. Start with the two transitions that cause the most rework, preview the rules, then enforce. Everything else is noise.

Related: ReadyGate

Related guides

Compliance · 2026-08-12

How Intrastat dispatches work for Shopify merchants in Spain

What Intrastat actually asks for, where Shopify order data fits, and how to run a calm monthly review.

Read guide

Security · 2026-07-10

Cyber Resilience Act evidence — what operational tooling can actually do

CRA scrutiny rewards a boring, complete trail: what shipped, what was known, what was fixed, when.

Read guide