Skip to content
NarrowForge

NF / Guide / Operations

Jira workflow validation checklist

The readiness checks teams actually need before work moves forward — and how to encode them.

2026-07-28

Why transitions leak

Work moves forward before it is ready: missing acceptance criteria, no linked design, no reviewer, no evidence. The fix is rarely a new process — it is making the existing expectation visible at the moment of transition.

The checklist

  • Required fields present (not placeholder text).
  • Linked issue or design where the workflow demands it.
  • Assignee and reviewer distinct, where applicable.
  • Acceptance criteria or definition-of-done reference.
  • Approval recorded for sensitive transitions.

Encoding it

Each item above maps to one rule on one transition. Start with the two transitions that cause the most rework, preview the rules, then enforce. Everything else is noise.

Related: ReadyGate

Related guides

Product samples · 2026-10-13

Prepare product samples and influencer seeding in Shopify

Review sample recipients, gift messages and stock without mixing the campaign with marketing automation.

Read guide

Corporate gifting · 2026-10-13

Prepare an employee gift campaign in Shopify

Build a recipient list, check products and separate the buyer from employee delivery addresses.

Read guide